Welcome to our Solar Para Niños initiative

Energy professionals, friends, colleagues, students, and lovers of renewable energy:

I am excited to launch this Solar Para Niños website to initiate a discussion on solar energy in Wisconsin, our nation and beyond. Students in the UW-Madison Sustainable Systems Engineering graduate degree program and the UW-Madison chapter of Engineers Without Borders and I will be contributing to this blog site in the year ahead.

Solar Para Niños is a partnership project between UW-Madison Engineers Without Borders (EWB), the Puerto Rico Relief Fund of South-Central Wisconsin (PRRFSCW) and graduate students in the Sustainable Systems Engineering (SSE) distance degree plan at UW-Madison.

We will plan, design, raise funds and install a distributed solar system (15-kW to 35-kW system, pending site assessment and funds raised) at a non-profit shelter for physically abused children in Puerto Rico – Hogar Albergue para Niños Jesús de Nazaret – which is located outside of Mayaguez and near the Bella vista Hospital.

  • The mission of the home is to provide shelter, food, transportation, health, education, recreation, social and psychological services to children who are victims of abuse, referred by the Department of the Family.
  • It serves newborns to 11 year-olds, and is licensed to serve 14 children. Currently it hosts eleven 3- to 9-year olds and three infants.
  • The Board of Directors supports the efforts and the cost of running the shelter with paid staff. At the moment, it is run with a 24-hour rotating staff of 21 employees. Having paid staff extends the shelter’s ability to help 21 additional families that depend on the salaries and benefits offered.Currently, the shelter pays about $1,000 a month in energy costs. The installation of solar panels through #SolarParaNiños is expected to cut the cost in half, allowing the center to invest more money in helping the children.
  • With this installation, the center’s energy costs will drop significantly – pending funds collected, our goal is to reduce their typical $1,000 monthly utility bill by at least half– allowing the center to invest more of their money into helping the kids.

To accomplish these goals, our phase-one, project-specific fund-raising goal is $80,000 by September 01. Our goal is largely to accomplish this through the efforts of the PRRF-SCW, UW EWB, and corporate and private matching donations.  Through June 1st, we have received $55,000 in sponsorship donations and commitments 🙂

The project involves lots of UW students and promotes not only learning by doing but also the promotion of awareness of engineering and disaster response, infrastructure resiliency, and sustainable energy system design.

If you liked my BikeTheWind.wordpress.com blog, this site will be in the same vein and narrative. (It’s official, I will leave for a 200-km #BikeTheSun tour on Friday, July 27th!)

Jim

James M. Tinjum, PE, PhD
Associate Professor, Program Director – Environmental and Energy Geotechnics
Associate Chair – Department of Engineering Professional Development
University of Wisconsin-Madison
jmtinjum@wisc.edu

 

Sustainable Systems Engineering


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s